SSI Datalink Applications
SSI Datalinks may be monitored by connecting Product Approved datalink monitoring devices manufactured by Park Signalling.
Connection of the S-LX system is via a Park Signalling Test Point Adapter, and “Master Module”. The SSI system may remain in service during installation.
The customer must supply a list of SSI channel names to MPEC prior to shipment in order to pre-configure the device.
The MPEC technical team will liaise with the customer to obtain this information.
The system can be provided, with or without the Park Signalling Test Point Adapters, fibre optic cables and master modules.
The fibre optic link to the SSI datalinks provides total galvanic isolation. There is there no risk of attaching a USB to RS232 hub to the S-LX device.
Sample Overlay Diagram