Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

The flow chart below summarises the steps required to successfully install and commission the S-LX system.

Detailed descriptions of each step can be found below

It is recommended that installation diagrams are prepared prior to installation and referred to throughout the installation process.

The S-LX system is highly flexible and can be applied to many serial port and Ethernet remote monitoring applications and is not limited to those listed below.

Please contact MPEC to discuss any potential further applications

If trouble is encountered please contact MPEC technical support for further assistance:

  • Telephone: 01332 363 979. Available Monday to Friday 8 AM to 4 PM UK time.

  • Email: support@mpec.co.uk. Response typically within 24 hours.

System Overview

  • Industrial Computing Platform to decode, pre-process, and buffer monitored system data

  • Isolating wide-range power supply, 85 to 230 V AC

  • High Impedance, Fault Tolerant, Isolated RS232 Input to allow non-intrusive monitoring

  • Isolated RS485 output prevents tampering with RS232 signal or data stream

  • 2 x Isolated LAN Ethernet Ports, for monitoring non-safety critical IP data streams, back-office connectivity or master-slave installation with additional S-LX systems.

  • Integral SD Card and SIM card for persistent data storage of provision of cellular connectivity

  • Integral LTE cellular modem

  • USB port for future monitoring and data storage applications

Prepare Overlay Diagrams

  • The means of connection to the monitored system will differ dependent on the application.

  • Refer to the application specific instructions below for example “overlay” wiring diagrams.

VHLC Level Crossing Applications

HXP3 Track Circuit Applications

Westronic S2 TDM Applications

Westronic 1024 TDM Applications

SSI Technicians Terminal Applications

AZLM Axle Counter Applications

MCS Applications

Unbox & Mount the S-LX system

Antenna Installation

Connect AC Power Supply

Connect Serial or Ethernet Connection

Commissioning

Energise Power Supply

Check for Data Transmission

Check for Cellular Modem Transmission

  • No labels