Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Drawio
zoom1
simple0
inComment0
pageId2401730561
custContentId2404614150
lbox1
diagramDisplayNameUntitled Diagram.drawio
contentVer12
revision12
baseUrlhttps://mpec.atlassian.net/wiki
diagramNameUntitled Diagram.drawio
pCenter0
width801948
links
tbstyle
height12561431

System Overview

Drawio
zoom1
simple0
inComment0
pageId2401730561
custContentId2404450437
lbox1
diagramDisplayNameOverview.drawio
contentVer1
revision1
baseUrlhttps://mpec.atlassian.net/wiki
diagramNameOverview.drawio
pCenter0
width1037.7600000000002
links
tbstyle
height781.4099999999999
  • Industrial Computing Platform to decode, pre-process, and buffer monitored system data

  • Isolating wide-range power supply, 85 to 230 V AC

  • High Impedance, Fault Tolerant, Isolated RS232 Input to allow non-intrusive monitoring

  • Isolated RS485 output prevents tampering with RS232 signal or data stream

  • 2 x Isolated LAN Ethernet Ports, for monitoring non-safety critical IP data streams, back-office connectivity or master-slave installation with additional S-LX systems.

  • Integral SD Card and SIM card for persistent data storage of and provision of cellular connectivity

  • Integral LTE cellular modem

  • USB port for future monitoring and data storage applications

...

  • The means of connection to the monitored system will differ dependent on the application.

  • Refer to the application specific instructions below for example “overlay” wiring diagrams.

Note

Inappropriate Installation of the S-LX carries the risk of importing safety and operational risk to the signalling system. Please follow any safety and operationally related guidance carefully in each application.

If in doubt, please contact MPEC for advice and support. support@mpec.co.uk

VHLC Level Crossing Applications

...

AZLM Axle Counter Applications

MCS Applications

SSI Datalink Applications

Schweizer Flex Life Level Crossing Applications

SEAR II Event Recorder Applications

FUES HABD Applications

Unbox & Mount the S-LX system

...

  • Antenna and antenna cable are supplied separately.

  • Mount the antenna external to the building

  • Never mount antenna inside an equipment enclosure or building

  • The antenna must be placed a minimum of 3 meters from sensitive electronic signalling equipment such as SSI.

  • The antenna features a magnetic mounting base. If this is not suitable, contact MPEC to discuss alternate mounting arrangements.

  • The antenna is to be mounted upright, with the “whip” element pointing skyward.

  • Ideally the antenna shall be placed clear of large structures and earthworks.

  • Bear in mind during placement that the antenna may need relocating during commissioning if inadequate signal strength is available.

  • A minimum 12 mm circular aperture is required to route the antenna cable into the building / enclosure.

  • If the building or enclosure structure must be pierced to run the antenna cable, ensure this is done in a responsible manner using appropriate tools. Any new openings must be appropriately sealed against moisture ingress and rodent attack.

  • route the antenna cable using appropriate cable management from antenna to SLX S-LX device.

  • Avoid sharp radius bends and never bend the antenna cable tighter than a 13mm radius.

  • Avoid running the antenna cable directly parallel and close to sensitive digital signal cables, such as SSI data links.

  • Do not attempt to shorten or lengthen the cable unless competent to do so and in possession of the appropriate tools and connectors.

  • MPEC offer a range of antenna cable lengths, so please contact MPEC if the standard 5m 10m cable is inappropriate.

  • Hand tighten the hexagonal SMA connector to terminal W1 of the S-LX compute module. Do not use tools to over-tighten.

  • Hand tighten the round TNC connector to the antenna base. Do not use tools to over-tighten.

...

Commissioning

  • Commissioning of the device can be split into three stages.

  • If issues are discovered, refer to the Trouble Shooting & Maintenance section.

  • S-LX Indication summary:

...

Energise Power Supply

  • Energise the main power supply and check:

    • HZS device Power Indication illuminates

    • S-LX device Power Indication illuminates

    • S-LX device then begins boot sequence. This can take up to one minute

    • S-LX Run Indication begins to flash. The should continue to flash whilst the device is operating

    • The S-LX Error Indication will illuminate during boot.

    • The S-LX Error indication will then extinguish once the boot sequence is complete

...

  • The Downlink indication on the TCC-120i will illuminate

  • The Disk access indication on the S-LX device will flash intermittently.

USB Connections

...

  • The USB indication on the S-LX will illuminate

  • The Disk access indication on the S-LX device will flash intermittently.

...