/
SA380TX and SA380TX-L RADAR Training
SA380TX and SA380TX-L RADAR Training
The pages below outline the steps required to design, install and commission an SA380TX series installation that meet the following criteria:
For deployment on the Network Rail RADAR system (formally known as the Intelligent Infrastructure system, or simply “The II”)
Only simple assets are considered
DC Track Circuits
Electrically driven switch machines
Hydraulically driven switch machines
Simple digital contact monitoring.
, multiple selections available,
Related content
SA380TX and SA380TX-L Training : Commission
SA380TX and SA380TX-L Training : Commission
More like this
SA380TX and SA380TX-L Training : Design
SA380TX and SA380TX-L Training : Design
Read with this
11-07-23 Release 2792
11-07-23 Release 2792
More like this
SA380TX and SA380TX-L Training : Install
SA380TX and SA380TX-L Training : Install
Read with this
SA380TX User Guide
SA380TX User Guide
More like this
11-07-23 Release 1319
11-07-23 Release 1319
More like this