Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
  • SSI Datalinks may be monitored by connecting Product Approved datalink monitoring devices manufactured by Park Signalling.

...

Info
  • Connection of the S-LX system is via a Park Signalling Test Point Adapter, and “Master Module”. The SSI system may remain in service during installation.

  • The customer must supply a list of SSI channel names to MPEC prior to shipment in order to pre-configure the device.

  • The MPEC technical team will liaise with the customer to obtain this information.

  • The system can be provided, with or without the Park Signalling Test Point Adapters, fibre optic cables and master modules.

Info
  • The fibre optic link to the SSI datalinks provides total galvanic isolation. There is there no risk of attaching a USB to RS232 hub to the S-LX device.

Sample Overlay Diagram

View file
nameSLX-TYP-SSIDL.pdf