Wiring must be installed to Signal Works Testing Handbook.
Testing is to be carried out by a signalling tester competent to Section 3B (I)
Commissioning is to be carried out by a competent Instrumentation Engineer.
Before any work takes place, a risk assessment and method statement for the installation and commissioning of the datalogger must be approved by the infrastructure controller.
Logistics
The device and accessories are supplied in a cardboard box with protective foam inserts. No special transport or handling requirements apply, and all components can easily be carried by one person.
Installation can be performed with common hand-tools; screwdrivers and spanners. Optionally, a drill may be used when mounting the device directly to a wall.
Maintenance does not require tools beyond a soft cloth for dusting
Removal of the device is the reverse of installation, requiring only simple hand-tools
At the end of its service life, the device may be returned to MPEC for responsible disposal. Do not dispose of the product with general waste.
Mechanical
...
Mounting
When ordering, specify mounting type required. This can be:
...